common and the chiller shall be capable of running on one compressor with the other compressor or any
of its auxiliaries inoperable or removed.
B. Each chiller shall be factory run-tested under load conditions for a minimum of one hour on an AHRI
qualified test stand with evaporator and condenser water flow at job conditions (excluding glycol
applications). Operating controls shall be adjusted and checked. The refrigerant charge shall be adjusted
for optimum operation and recorded on the unit nameplate. Units operating with 50-Hz power shall be
tested with a 50-Hz power supply. Any deviation in performance or operation shall be remedied prior to
shipment and the unit retested if necessary to confirm repairs or adjustments. Manufacturer shall supply
a certificate of completion of a successful run-test upon request.
-- OR –
B. Each chiller shall under go a [one] OR [two] OR [three] OR [four] or [five] or [ten] point certified
factory performance tested on an AHRI qualified test stand with water at job conditions (excluding
glycol applications). A manufacture’s engineer shall oversee the testing, certify the accuracy of the
computerized results, and then translates the test data onto an easy-to-read spreadsheet provided to the
owner. The tests are to be run as specified in advance and are run to within AHRI tolerance of capacity
and power. 50 Hz units are run tested at 60 Hz to their maximum motor power. Operating controls shall
be adjusted and checked. The refrigerant charge shall be adjusted for optimum operation and recorded
on the unit nameplate. Units operating with 50-Hz power shall be tested with a 50-Hz power supply.
Any deviation in performance or operation shall be remedied prior to shipment and the unit retested if
necessary to confirm repairs or adjustments.
--OR--
B. Each chiller shall under go a [one] OR [two] OR [three] OR [four] or [five] or [ten] point certified
witness performance test on an AHRI qualified test stand with water at job conditions (excluding glycol
applications). A manufacture’s engineer shall oversee the testing in the presence of the owner or
owners representative, certify the accuracy of the computerized results, and then translates the test data
onto an easy-to-read spreadsheet provided to the owner. The tests are to be run as specified in advance
and are run to within AHRI tolerance of capacity and power. 50 Hz units are run tested at 60 Hz to their
maximum motor power. Operating controls shall be adjusted and checked. The refrigerant charge shall
be adjusted for optimum operation and recorded on the unit nameplate. Units operating with 50-Hz
power shall be tested with a 50-Hz power supply. Any deviation in performance or operation shall be
remedied prior to shipment and the unit retested if necessary to confirm repairs or adjustments.
C. [Optional] A certified sound test shall be performed in accordance with AHRI 575 on each chiller at
full load conditions. A manufacturers engineer shall oversee the testing and provide a complete sound
report.
2.3 DESIGN REQUIREMENTS
General: Provide a complete water-cooled, semi-hermetic oil-free centrifugal compressor water chiller as
specified herein. The unit shall be provided according to standards indicated in Section 1.2. In general,
unit shall consist of one or two magnetic bearing, completely oil-free centrifugal compressors,
refrigerant, condenser and evaporator, and control systems including integrated variable frequency
drive, operating controls and equipment protection controls. Chillers shall be designed to operate within
an ambient temperature range of 20ºF to 130ºF with a maximum humidity of 95% (non-condensing)
and shall be charged with refrigerant HFC-134a. If manufacturer offers a chiller using any HCFC
refrigerant that is subject to phase out by the Montreal Protocol or the U.S. Clean Air Act, manufacturer
shall provide, in writing, documentation signed by an officer of the company assuring refrigerant
availability and price schedule for a 20-year period.
A. The entire chiller system, including all pressure vessels, shall remain above atmospheric pressure during
all operating conditions and during shut down to ensure that non-condensables and moisture do not