Catalog 602-2 61
5. IBC Certification: The chiller shall be certified to the following codes and standards; 2009 IBC, 2010
CBC, ICC-ES AC-156, ASCE 7-05. The chiller must be mounted to a rigid base and may use neoprene
waffle vibration pads.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Installing contractor to:
1. Install per manufacturer's requirements, shop drawings, and contract documents.
2. Adjust chiller alignment on foundations, or subbases as called for on drawings.
3. Arrange piping to allow for dismantling to permit head removal and tube cleaning.
4. Coordinate electrical installation with electrical contractor.
5. Coordinate controls with control contractor.
6. Provide all material required for a fully operational and functional chiller.
7 Install unit in a dry indoor location consistent with NEMA 1 design.
3.2 START-UP
A. Factory Start-Up Services: Provide for as long a time as is necessary to ensure proper operation of the unit,
but in no case for less than two full working days. During the period of start-up, the start-up technician
shall instruct the owner's representative in proper care and operation of the unit.