Daikin Quaternity H-Series Specifications Page 30

  • Download
  • Add to my manuals
  • Print
  • Page
    / 80
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 29
EDUS04-906_b Installation Manual
Room Air Conditioners H-Series 29
9
6.
Connecting to the HA system.
1) Remove the front grille. (3 screws)
2) Remove the decelerator assembly parts.
(1 screw)
2-1) Remove the decelerator assembly
part screws. (See Fig. 1)
2-2) Remove the decelerator assembly
part connector. Remove by pressing
on the tabs on the bottom of the
connector.
(See the tab position diagram 1)
3) Remove the electric parts box.
(1 screw, 2 tabs)
3-1) Remove the electric parts box fixing
screw.
3-2) Pull the electric parts box toward
you and discharge the tab 2.
4) Remove the electric parts box cover.
(3 tabs) (Refer to Fig. 2)
4-1) Discharge the tab 3.
4-2) Pull up the electric parts box cover
slowly, discharge the tab 4, slide up,
and discharge the tab
5.
5) Insert the connection cord into the HA
connector “S21”.
6) Lay the connection cord as shown in
“Fig. 3”.
7) Replace the electric parts box cover and
electric parts box as they were.
8) Attach the decelerator assembly part
along with the guide rail. (Refer to Fig. 2)
9) Install the front grille.
Fig. 1
Decelerator assembly
part fixing screw
Anti-drip cover
Electric parts box
fixing screw
Anti-drip cover
fixing screw
Position of tabs on the decelerator
assembly part connector
Location of the tabs
on the electric parts box
Ta b
Ta b 2
Ta b 1
Buzzer
Ta b 3
Electric parts box cover
Guide rail
Ta b 4
Ta b 5
Fig. 2
Inside the electric parts box
Fig. 3
Electric parts box cover
HA connector
“S21”
To connection cord
Page view 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 79 80

Comments to this Manuals

No comments