Installation SiUS39-506
38 General Information
Vacuum Drying
Procedure
There are two vacuum drying methods and the appropriate one should always be chosen to
conform with individual local conditions.
[Normal vacuum drying]........The standard method
[Operational steps]
1. Vacuum drying (1st time): Connect a manifold gauge to the service port of the liquid or gas pipe
and operate the vacuum pump for at least 2 hours.
(The degree of vacuum produced should be in excess of 14.61psi (755 mmHg))
If after 2 hours the vacuum produced has not exceeded 5 mmHg then either there is moisture in
the pipe or there is a leak. Operate the vacuum pump for a further hour.
If, even after 3 hours, the vacuum has not reached 14.61 (755 mmHg) then check the system
for a leak.
2. Carry out maintained vacuum test.
Produce a vacuum in excess of 14.61psi (755 mmHg) and do not release it for an hour or
more. Check the vacuum gauge to make sure that it has not risen. (If the gauge does rise then
there is still moisture in the pipe or there is a leak somewhere.)
3. Additional charge of refrigerant.
Connect the charging cylinder to the liquid pipe service port and charge with the required
amount of refrigerant.
4. Open stop valve to the full.
Open the stop valves on the liquid and the gas pipes to the full.
Note: Vacuums should be produced in both the liquid and the gas pipes.
(Because there are a large number of functional components in the indoor unit which cut off the
vacuum midway through)
7.25psi
0psi
14.7psi
14.6psi
(755mmHg)