Daikin REYQ168 Installation Manual Page 247

  • Download
  • Add to my manuals
  • Print
  • Page
    / 248
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 246
SiUS39-506
Drawings & Flow Charts v
Operational steps ............................................... 20
The 3 Principles of Refrigerant Piping ................ 20
Refrigerant Piping ................................................... 158
S
Selecting Installation Site ........................................ 192
Selection of Location............................................... 153
AM broadcasting......................................... 59
,
153
servicing and the minimum space .............. 58
,
153
Service Space ........................................................... 60
Service Space for Indoor Units ................................. 17
Set the flaring tool ..................................................... 26
Setting of Air Flow Direction Adjustment Range ....... 77
Setting of Demand Operation.................................... 94
Image of operation in the case of A.................... 95
Image of operation in the case of A and B ......... 95
Image of operation in the case of B.................... 95
Setting of Low Noise Operation ................................ 92
Image of operation in the case of A.................... 93
Image of operation in the case of A, B ............... 93
Image of operation in the case of B.................... 93
Setting the Master Remote Controller..................... 221
Side (bottom) connection ........................................ 159
Signal interference due to use of
multiple core cable ........................................... 135
Sleeve and Insert Work
Operational steps ............................................... 14
Steel insert.......................................................... 15
Through holes in a reinforced concrete beam .... 14
Sound pressure rise due to room reverberation...... 104
Special vacuum drying time chart ............................. 40
Standard Operation Limit ........................................ 148
standard work practice for all brazing work............... 21
System example...................................................... 173
T
The analysis of major installation problems
experienced during the year of 1988 ................... 7
The centralized control group number
cannot be set ................................................... 141
The unit must be installed on a solid longitudinal
foundation ........................................................ 156
The use of hard solder is essential ......................... 25
Thermal Insulation Work (Refrigerant Piping)
Essential Points of Thermal Insulation................ 31
Heat Recovery Series......................................... 32
Operational steps ............................................... 31
Tighten the bolts in opposite corners first to ensure that
the connection is true......................................... 30
Torque wrench ........................................................ 233
Transmission wiring between the cool/heat
selector and the outdoor unit is too close
to a high voltage wire ....................................... 141
U
Unpacking and Placing the Unit ................................ 62
DO NOT USE STANDS TO SUPPORT THE
CORNERS .............................................62
foundation bolts...................................................62
passing piping out through the front....................63
The unit must be installed on a solid longitudinal
foundation ..............................................62
V
Vacuum Drying ..........................................................34
Vacuum Drying Procedure.........................................38
Vacuum pump with check valve ..............................233
VRV Inspection Sheet..............................................123
W
Weigher for refrigerant charge.................................235
Where there are no smaller room divisions .............102
Wired Remote Controller ...........................................70
Wiring Diagram
Field Wiring .......................................................133
Wiring Diagrams ......................................................132
Field Wiring .......................................................133
Outdoor Unit......................................................132
with cool/heat changeover .......................................216
without cool/heat changeover ..................................215
Page view 246
1 2 ... 242 243 244 245 246 247 248

Comments to this Manuals

No comments