SiUS39-506 Points to Bear in Mind at the System Design
General Information 11
2.4.2 Main Considerations in Preparation of Control Circuit Diagrams
In addition to the design of the appropriate this system configuration it is also essential that the
control system be made amply clear. If the system is designed and installed without a clear,
comprehensive plan then problems are inevitably going to occur during the test run.
Servicing too will become much more time consuming than necessary. However, if control circuit
diagrams are prepared along with the contract drawings in order to make the total system clearly
visible then the essential points relating to the electrical connections will be easily understood, the
test run will go off without a hitch and the whole system will be rendered fully effective.
Step 1: Compiling
a System List
1. Mark each outdoor unit with a code.
2. Add field settings and data for outdoor units, and outdoor unit No. if using sequential start.
3. Add the model number of each indoor unit connected to each refrigerant circuit.
4. Assign each indoor unit a code.
5. Fill in the location of each indoor unit.
6. Group indoor units controlled by one or two remote controllers. (group or individual control).
7. Assign central group Nos. if using centralized control.
8. Add field settings and optional equipment for indoor units.
9. Add unit No. if making separate field settings for each indoor unit under group control.
Note: With the VRV II R-410A Heat Recovery Series, unit No. is determined through automatic
addressing, therefore readout unit Nos. after activating the power.
For details on field settings and centralized control group No., refer to the installation manual and
system reference materials.
Example: System list
Outdoor Unit Indoor Unit
Model Name
(code)
Field Settings Model Name System Name Location
Remote
Controller
Group
Centralized
Control Group
No.
Unit No.
Optional
equipment, field
settings, etc.
REYQ96M
(PAC1)
Cool/Heat
selector:
Indoor unit
Low noise
operation
(L.N.O.P):
Individual control
Sequential start:
ON Defrost:
Earlier Sequential
start No.
FQ12M 2F01
2nd floor
office
A 1–00
SQ18M 2F02
2nd floor
office
A (1–00)
FQ18M 2F03
2nd floor
office
A (1–00)
MQ30M 2F04
2nd floor
office
B 1–01
FQ12M 2F05
2nd floor
office
B (1–01)
REYQ96M
(PAC2)
Cool/Heat
selector:
Indoor unit
Low noise
operation
(L.N.O.P):
Individual control
Sequential start:
ON Defrost:
Earlier
SQ12M 3F01
3rd floor
office
C 1–02
FQ24M 3F02
3rd floor
office
C (1–02)
SQ24M 3F03
3nd floor
office
C (1–02)
FQ24M 3F04
3rd floor
office
D 1–03