Daikin BRC7E61W Service Manual Page 217

  • Download
  • Add to my manuals
  • Print
  • Page
    / 255
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 216
FHYCP71~140D SiE25-110
208 Removal Procedure
1.9 Removal of Fan Motor
Procedure Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure Points
Remove the terminal
block box cover according
to the procedure for
removing the switch box,
then disconnect the
following connectors.
Transfer connector
Wired remote controller
Swing motor
Humidity sensor
Connector built in the
switch box
Connector used for
power supply cables
1. Removing the bell mouth.
1
Disconnect the 2
remote controller
cables and 3 power
supply cables.
2
Disconnect the drain
pump and float switch
wiring from bell mouth.
(
*1)
3
Remove the 5 mounting
screws on the bell
mouth.
*1:
At this time, do not cut the
clamp material attached to the
drain pan near the switch box.
Loosen the mounting screw to
remove the clamp material.
Page view 216
1 2 ... 212 213 214 215 216 217 218 219 220 221 222 ... 254 255

Comments to this Manuals

No comments