Daikin J Series Service Manual Page 276

  • Download
  • Add to my manuals
  • Print
  • Page
    / 344
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 275
SiE18-201 For BPMK928B42 · 43
Removal Procedure 265
1.3 Removal of Motorized Valve
Procedure Warning Be sure to turn off all power supplies before disassembling work.
Step Procedure Points
1. Detaching the bottom
panel
1
Loosen the two
keyhole-provided
screws and remove the
two other screws from
the electrical mounting
plate.
2. Removing the motorized
valve coil
When reassembling, make
sure the motorized valve coil
spring clicks and feels
caught.
1
Slide the motorized
valve coil to the right
and take it out.
3. Undoing the clamp The plain, red, blue and
yellow markings are
provided from the front
bottom.
1
Remove the harness
clamp from the side.
Page view 275
1 2 ... 271 272 273 274 275 276 277 278 279 280 281 ... 343 344

Comments to this Manuals

No comments