Daikin BRC1E51A7 Installation Manual Page 9

  • Download
  • Add to my manuals
  • Print
  • Page
    / 32
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 8
English 7
(2) Make the ceiling opening needed for installation where applicable. (For existing ceilings)
Refer to the paper pattern for installation (5) for ceiling opening dimensions.
Create the ceiling opening required for installation. From the side of the opening to the casing outlet,
implement the refrigerant and drain piping and wiring for remote controller and indoor-outdoor unit cas-
ing outlet. Refer to ‘‘6. REFRIGERANT PIPING WORK’, ‘‘7. DRAIN PIPING WORK’’ and ‘‘8. ELECTRIC
WIRING WORK’.
After making an opening in the ceiling, it may be necessary to reinforce ceiling beams to keep the ceiling
level and to prevent it from vibrating. Consult the builder for details.
(3) Install the suspension bolts.
(Use either a M8~M10 size bolt)
Use a hole-in anchor for existing ceilings, and
a sunken insert, sunken anchor or other field
supplied parts for new ceilings to reinforce
the ceiling to bear the weight of the unit.
Adjust clearance (50 – 100 mm) from the
ceiling before proceeding further.
NOTE
All the above parts are field supplied.
50 – 100
Ceiling slab
Suspension bolt
Long nut or turn-buckle
Anchor
False ceiling
<installation example>
Fig. 7
Page view 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 31 32

Comments to this Manuals

No comments