applICaTIon ConsIderaTIons
CAT 602-4 • MAGNITUDE
®
MODEL WMC CHILLERS 16 www.DaikinApplied.com
Type B Knockdown, “Partial Disassembly”
Compressor(s), power boxes, and control boxes are removed and shipped on separate skids; combined vessel stack is shipped
together as a sub-assembly.
Figure 11: Type B Knockdown
Type B Scope:
• Compressor(s), power boxes, and control boxes
are removed (at the factory) and shipped on separate
skids; vessel stack is shipped as a complete sub-
assembly.
• All associated piping and wiring remain attached, if
possible.
• Compressors and vessels receive a Nitrogen holding
charge.
• All free piping ends are capped.
• Suction and discharge lines have bolt-on anges and, if
possible, remain attached.
• Unit ships with vessel and/or head insulation, if ordered.
• Refrigerant will not be shipped with the chiller and must
be procured locally.
• Site re-assembly must be supervised or completed by
Daikin Applied service personnel.
• Ideal for retrot applications where it is desired that
the compressors, power boxes, and control boxes be
removed at the factory, prior to shipment, and where
refrigerant may be secured locally.
POWER BOX
OITS PANEL BOX
CONTROL BOX
COMPRESSOR(S)
DETAIL D
COMPRESSOR(S)
BLOCKOFF
BLOCKOFF
DETAIL C
DETAIL A
DETAIL B
•
CRATE TO CONTAIN:
DISCHARGE PIPING•
SUCTION ELBOW•
MOTOR COOLING•
GLUE•
LOOSE INSULATION•
MISCELLANEOUS ITEMS
GLUE
FRONT VIEW
ISOMETRIC