Daikin WMC Specifications Page 10

  • Download
  • Add to my manuals
  • Print
  • Page
    / 24
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 9
Unit Options
Export Packaging
A wooden skid that aids in moving the unit and tight tting
plastic covering the entire unit to protect it from dirt and grime
during transit and storage are standard. Open and closed
crating is also offered as an option.
Pumpout Unit, With or Without Storage Vessel
Available in a variety of sizes, single-phase or three-phase,
with and without tanks. Contact your Daikin Applied sales
ofce for details.
Extended Warranties
Extended 1, 2, 3, or 4 year warranties for parts only or for
parts and labor are available for the compressor/motor only,
the entire unit, or the entire unit including refrigerant.
Witness Performance Test
The specied full and/or part load tests, as ordered, are
performed in the presence of the customer under the
supervision of a factory engineer and include compilation of
the test data onto an easy-to-read spreadsheet.
Non-Witness Test
The specied full and/or part load run tests, as ordered, are
performed under the supervision of a factory engineer; data is
compiled, certied and transmitted to the customer.
Refrigerant Charge
Holding charge of Nitrogen or R-134a. Shipping with a full
charge of R-134a is standard.
Knockdown Shipment
Several options for a knockdown shipment to facilitate unit
placement. See Retrot Knockdown on page 15 for details.
Vessel Options
Marine Waterboxes
Provide tube access for inspection, cleaning, and removal
without dismantling water piping.
Flanges (grooved connections are standard)
ANSI raised face anges on either the evaporator or
condenser. Mating anges are by others.
300 psi Water Side Vessel Construction
For high pressure water systems, typically high-rise building
construction (150 psi is standard).
Epoxy and Ceramic Coating
Evaporator and condenser heads and marine waterboxes can
be coated for corrosion protection with either epoxy or ceramic
coatings. Tube sheets may also be ceramic coated.
Single Insulation - Evaporator Shell / Suction Piping
0.75-inch thermal insulation on cold surfaces excluding heads
and waterboxes.
Single Insulation - Evaporator Heads and
Waterboxes
0.75-inch thermal insulation.
Double Insulation - Evaporator Shell / Suction
Piping
1.5-inch thermal insulation on cold surfaces (0.75-inch on
suction piping) excluding heads and waterboxes.
Double Insulation - Evaporator Heads and
Waterboxes
1.5-inch thermal insulation.
Hinged Waterbox Covers and Heads
Hinges for marine waterbox covers or heads (compact
waterboxes) to aid in heat exchanger maintenance.
Tube Size, Wall Thickness and Material
A wide range of tube options are available to accommodate
most ow rates and uids. Standard wall thickness is 0.025-
inch, optional 0.028-inch or 0.035-inch.
Controls Options
BAS Interface Module
Factory-installed on the unit controller for the applicable
protocol being used (Can also be retrot):
BACnet
®
MS/TP
BACnet
®
IP
BACnet
®
Ethernet
LonWorks
®
Modbus
®
RTU
Electrical Options
Power Panel High Short Circuit Current Rating
65 kA panel rating (Standard is 35 kA).
EMI Filter
Factory-installed option. Radio interference lter.
Ground Fault Protection
Protects equipment from arcing ground fault damage from
line-to-ground fault currents less than those required for
conductor protection.
Input Power Meter
Allows display of input phase amps and volts on the operator
interface screen.
CAT 602-4 • MAGNITUDE
®
MODEL WMC CHILLERS 10 www.DaikinApplied.com
opTIons and aCCessorIes
opTIons and aCCessorIes
Page view 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 23 24

Comments to this Manuals

No comments