Daikin FTXG25EV1BS Service Manual Page 264

  • Download
  • Add to my manuals
  • Print
  • Page
    / 323
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 263
Outdoor Unit (80 / 90 Class) SiEBE12-625
254 Removal Procedure
1.3 Removal of Electrical Box
Procedure Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure Points
Remove the outer panels
such as top and front
panels.
Match the colors of the tie
wires to A, B, C and D ports
as follows.
(1) - Black Power
(2) - White Power
(3) - Red Transmission
Wires are fixed to the
terminal board with screws.
1
The figure shows the
right side view.
1. Remove the tie wire.
1
Loosen the terminal
board screws, and
remove the wires at A
and B ports.
2
Open the terminal
board cover, and
remove the wires at C
and D ports.
When reassembling,
reconnect the wires to C and
D ports.
A port
B port
D port
C port
PC board for servicing
Power terminal board
(L) - White
(N) - Black
Earth terminal
screw
Wiring fixture
Terminal
board cover
Page view 263
1 2 ... 259 260 261 262 263 264 265 266 267 268 269 ... 322 323

Comments to this Manuals

No comments