3
11
Ventilation • ERQ-AW1
31
Outdoor Unit • ERQ-AW1
11 External connection diagrams
11 - 1 External Connection Diagrams
3TW27809-1
1 All wiring, components and materials to be produced on the site must
comply with the applicable local and national codes.
2 Use copper conductors only.
3 For more details, see wiring diagram.
4 Install a circuit breaker for safety.
5 All field wiring and components must be installed by a licensed electrician.
6 All field wiring and components must be provided by a licensed electrician
and must comply with the relevant local and national codes.
7 Wiring shown are general points-of-connection guides only and are not
intended for or to include all details for a specific installation.
8 Be sure to install the switch and the fuse to the power line of each
equipment.
9 Install the main switch that can interrupt all power sources in an integrated
manner because this system consists of the equipment utilizing the multiple
power sources.
10 If there exists the possibility of reversed phase, lose phase, momentary
blackout or the power goes on and off while the product is operating,
attach a reversed phase protection circuit locally.
11 For detailed control box side connection, see control box manual and wiring
diagram.
ERQ-AW1
Power supply
Main switch
Switch
Fuse
Switch
Fuse
(Power line)
(Transmission line)
Control box
Power supply
2 wires cable
2 wires cable
2 wires cable
(Power line)
Outdoor unit
Main switch