Daikin RXS24LVJU Installation Manual Page 4

  • Download
  • Add to my manuals
  • Print
  • Page
    / 14
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 3
3
English
Precautions for Selecting the Location
1) Chooseaplacesolidenoughtobeartheweightandvibrationoftheunit,wheretheoperationsoundswillnotbeamplied.
2)
Choosealocationwherethehotairdischargedfromtheunitortheoperationsoundswillnotdisturbtheneighborsoftheuser.
3)
Avoidinstallingnearbedroomssothatoperationsoundswillnotbeaproblem.
4)
Theremustbesufcientspaceforcarryingtheunitintoandoutofthesite.
5)
Theremustbesufcientspaceforairpassageandnoobstructionsaroundtheairinletandtheairoutlet.
6)
Thesitemustbefreefromthepossibilityofammablegasleakageinanearbyplace.
7)
Installunits,powercordsandinter-unitwireatleast10ft(3m)awayfromtelevisionandradiosets.Thisistopreventinterference
toimagesandsounds.(Noisesmaybeheardeveniftheyaremorethan10ft(3m)awaydependingonradiowaveconditions.)
8)
Incoastalareasorotherplaceswithsaltyatmosphereofsulfategas,corrosionmayshortenthelifeoftheairconditioner.
9)
Sincedrainowsoutoftheoutdoorunit,donotplaceanythingundertheunitwhichmustbekeptawayfrommoisture.
NOTE
Cannotbeinstalledhangingfromceilingorstacked.
CAUTION
Whenoperatingtheairconditionerinalowoutdoorambient
temperature,besuretofollowtheinstructionsdescribedbelow.
•Topreventexposuretowind,installtheoutdoorunitwithitssuction
sidefacingthewall.
•Neverinstalltheoutdoorunitatasitewherethesuctionsidemay
beexposeddirectlytowind.
•Topreventexposuretowind,itisrecommendedtoinstallabafe
plateontheairdischargesideoftheoutdoorunit.
•Inheavysnowfallareas,selectaninstallationsitewherethesnow
willnotaffecttheunit.
Construct a large canopy.
Construct a pedestal.
Install the unit high enough off the
ground to prevent burying in snow.
Precautions on Installation
•
Checkthestrengthandleveloftheinstallationgroundsothattheunitwillnotcauseanyoperatingvibrationornoiseafterinstalled.
•Inaccordancewiththefoundationdrawing,xtheunitsecurelybymeansofthefoundationbolts.
(Prepare4setsof5/16or3/8inch(M8orM10)foundationbolts,nutsandwasherseachwhichareavailableonthemarket.)
•Itisbesttoscrewinthefoundationboltsuntiltheirendsare3/4inch(20mm)fromthefoundationsurface.
3/4 inch
(20mm)
01_EN_3P300674-2.indd 3 10/5/2011 2:41:54 PM
Page view 3
1 2 3 4 5 6 7 8 9 ... 13 14

Comments to this Manuals

No comments