Daikin RXYQ10PY1 Installation Manual

Browse online or download Installation Manual for Split-system air conditioners Daikin RXYQ10PY1. Daikin RXYQ10PY1 Installation manual User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 24
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
System air conditioner
INSTALLATION MANUAL
REYQ8PY1B
REYQ10PY1B
REYQ12PY1B
REYQ14PY1B
REYQ16PY1B
English
Deutsch
Français
Español
Italiano
ΕλληνικÜ
Nederlands
Portugues
Рóссêий
Türkçe
Installation manual
VRV
III
System air conditioner
Installationsanleitung
VRV
III
System Klimaanlage
Manuel d’installation
Conditionneur d’air VRV
III
System
Manual de instalación
Sistema de acondicionador de aire VRV
III
Manuale di installazione
Condizionatore d’aria a sistema VRV
III
Εγχειρßδιο εγκατÜστασηò
Κλιìατιστικü ìε σýστηìα VRV
III
Installatiehandleiding
Airconditioner met VRV
III
Systeem
Manual de instalação
Ar condicionado VRV
III
System
Рóêоводство по монтажó
Кондиционер системы VRV
III
Montaj elkitabý
VRV
III
System Klima
00_CV_3P201178-4B.fm Page 1 Monday, May 21, 2007 9:09 AM
Page view 0
1 2 3 4 5 6 ... 23 24

Summary of Contents

Page 1 - INSTALLATION MANUAL

System air conditionerINSTALLATION MANUALREYQ8PY1BREYQ10PY1BREYQ12PY1BREYQ14PY1BREYQ16PY1BEnglishDeutschFrançaisEspañolItalianoΕλληνικÜNederlandsPortu

Page 2 - Machinery Safety 98/37/EC

English 44.The refrigerant R410A itself is nontoxic, nonflammable and is safe. If the refrigerant should leak however, its concentration may exceed th

Page 3

5 English6-3 Pipe connection• Be sure to perform nitrogen permutation or nitrogen blow when brazing. (Refer to figure 8)Brazing without performing nit

Page 4 - L1 L2 L3 N

English 66-5 Example of connectionExample of connection(Connection of 8 indoor units)IndoorunitsideOutdoorunitside12BSUnitSuction gas pipeHP/LP gas pi

Page 5

7 EnglishOutdoor unit multi connection piping kit andRefrigerant branch kit selectionPipe size selection• Refrigerant branch kits can only be used wit

Page 6 - 3P201178-4B EM07A013

English 8Required Conditions Example Drawings1. It is necessary to increase the pipe size between the first branch kit and the final branch kit. (Redu

Page 7 - 1. FIRST OF ALL

9 English7. FIELD WIRINGCaution• All field wiring and components must be installed by a licensed electrician and must comply with relevant local and n

Page 8 - 2. INTRODUCTION

English 107-4 Transmission Wiring Connection Procedure• Referring to figure 19 connect the transmission wiring between outdoor unit and indoor unit, o

Page 9 - 3. SELECTION OF LOCATION

11 English7. When routing out the transmission wiring from the knockout hole.8.When routing out the power/ground wires from the right side.9. Power wi

Page 10 - 6. REFRIGERANT PIPING

English 1210. CHECKING OF DEVICE AND INSTAL-LATION CONDITIONSBe sure to check the followings.For those doing electrical work1.Make sure there is no fa

Page 11 - 5 English

13 English[How to Check How Many Units are Connected]It is possible to find out how many indoor or outdoor unit in the system are turned on by operati

Page 12 - English 6

Umeda Center Bldg., 4-12, Nakazaki-Nishi 2-chome,Kita-ku, Osaka, 530-8323 JapanDAIKIN INDUSTRIES, LTD.EN60335-2-40,DAIKIN.TCF.024TNO05102601013P177868

Page 13 - Pipe size selection

English 1411-2-1 Procedure of Adding Refrigerant charging1.Make sure the following works are complete in accordance with the installation manual. Pip

Page 14 - English 8

15 EnglishBeware the fan running when open the front panel.The fan may continue rotation after the system stop the operation.(8) When the required amo

Page 15 - 7. FIELD WIRING

English 16[Remote controller displays malfunction code]NoteIf any malfunction codes other than the above are displayed, check the service manual for h

Page 16 - English 10

17 EnglishProcedure for checking maximum concentrationCheck the maximum concentration level in accordance with steps 1 to 4 below and take whatever ac

Page 17 - [R410A] Label

English 18NOTES01_EN_3P201178-4B.fm Page 18 Friday, May 18, 2007 7:58 PM

Page 18 - CHARGE AND CHECK OPERATION

21figure 1figure 4figure 3≥1500314252(mm)≥1000≥1000≥1000≥1500≥1500≥15001figure 2≥10≥10≥10≥20≥20≥50≥50≥50≥200≥400 ≥400≥50≥10≥300 ≥300≥500≥500≥500≥500≥1

Page 19

figure 19figure 221123453478296111281213151412349876510figure 17figure 18 TO IN/D UNIT TO OUT/D UNITF1 F2 F1 F21234A1P TO IN/D UNITF1 F2 F1 F2 TO OUT/

Page 20 - Heating mode

123425786figure 31figure 26 figure 27123456789101314151112: 18: 19(): 16: 1712132figure 25123101112456789(): 13: 14: 15: 163111210456798(): 13: 14: 15

Page 21 - 15 English

3P201178-4B EM07A013(0705) HT00_CV_3P201178-4B.fm Page 5 Monday, May 21, 2007 9:09 AM

Page 22 - 13. TEST RUN

REYQ8PY1BREYQ10PY1BREYQ12PY1BREYQ14PY1BREYQ16PY1BVRVIII System air conditionerInstallation manual1 EnglishCONTENTS1. FIRST OF ALL ...

Page 23 - 17 English

English 2• The indoor and BS unit should be installed as far away from fluo-rescent lighting as possible.Remote controller (wireless kit) transmitting

Page 24 - English 18

3 English2-2 Standard supplied accessoriesConfirm the following accessories are included. The storage location of the accessories is shown in figure 1

Comments to this Manuals

No comments